Well I finally had a few days to work on the bucket, been traveling to Thailand alot for work these past few months and I finally had a few days for myself. Here is what I was able to get done. I got the drive shaft together, the fan shroud and water hoses on, gas tank and battery box mounted and plumbed, Lokar shifter is in, Trans cooler mounted and the overflow tank mounted. I finally got my chrome trans pan and Lokar trans dip stick so I put those on also. I updated my picture gallery with more current pics.:swim: Do you ever get to drive these things or just work on them forever?
