A little Mid-Weekend update . . . .
So last weekend was kind of a blur, and I didn't post any pics as I ran out of light both days before I was ready to knock off for the day.
As most may recall, I tried putting my front drive kit on a couple weeks back, only to find that the alternator mounting/pivot bolt didn't line up with the tapped hole in the head , and that the belt was way too short.
I checked with the makers of the kit, CVF racing, and they attributed it to variations in head manufacture, especially in the BBC. . . . but not really their responsibility to make right . . . (though as I recall, they did say they'd get me a longer belt)
Essentially though, they left me to come up with my own solution . . . .
So that was last Saturday's project, while Sunday was devoted to assembling the el-cheapo Larin METS 1 engine run stand . . .
I didn't have any aluminum plate to solve the alternator mounting issue, but had plenty of acrylic sheet, so I made a mounting plate from that, figuring to use it as a template once the 6061-T6, 5/16" thick aluminum plate I ordered from McMaster arrived.
As luck would have it, my McMaster order arrived at the post office today, earlier than expected, and I just made it by about 10 minutes to pick it up before the noon closing time. (My Summit order had arrived yesterday with a longer belt and some other bits)
Today was spent remaking the acrylic plate with an aluminum one and fitting a longer belt.
Overall it was quite successful . . . looks good, and has all stainless steel hardware.
I did have to rotate the rear half of the alternator housing to get the bat connection to sit out in the open for easier access, and the rear bearing boss just clears the 5/16" plate by about 0.050" or so, so I don't have any bind or interference when adjusting for belt length/wear.
I finished running the fuel system on the motor, all 1/2" line. It's just rubber hose for now, so I can test run. Once it's in the car, I'll convert to 8AN. I'm also still waiting on a couple 1/2" inline fuel filters that should arrive this week so I have a filter in the fuel line and also ordered a roll of 1/2" aluminum fuel line tubing.
I installed the oil pressure sender and temp sender in the motor for the test stand gages, and plan to put the motor in the test stand tomorrow.
I also ordered a set of Patriot sprint headers for the BBC, just plain black ones so I can test run the motor and use them for break in before putting the new AHC coated headers that come with my kit on the motor in the car . . . I'm told that new motors always run notably hotter than broken in ones, and will discolor new headers if used before sufficient break in time is accumulated.
Hopefully . . . they will arrive this week coming, (along with my fuel filter and some other minor bits) and I'll be ready to test run . . . .
Anyway . . . . Here's some new pics: